
Posted by: neil on:04 Jan 2017 General » Beata's Work Experience Week |
|
![]() |
Tweet |
Monday On the first day I arrived at 5:00pm and I got shown around the whole studio. It turned out to be bigger than I expected. I have never seen a proper music studio so I was overwhelmed at the amount of professional equipment. After a tour of the place, Sam asked me to help him with setting up the drum kits and things like music stands and microphones for the bands that were coming in later in the evening. The next task was for me to fix an XLR cable which was fun and something I have never gotten a chance to do. I loved listening to all the different bands practising their music as well as music that I already knew. I found it very interesting to hear such creative and varied music genres. At the end of the day I tidied up the studios and set up equipment with Sam for the Rockschool exams that were happening the next day and throughout the rest of the week. The time has gone so fast this day that I haven’t realised it was 11:00pm; time for me to go home. All the staff was so nice and helpful. I really enjoyed my first day at Farm Factory Studios and I knew that I chose the right place for my working experience. |
|
![]() |
Tuesday
Wednesday
Thursday |
Friday |
Post a comment